The public is invited to the Community Open House for the Niles North High School Aquatics Center held from 11 a.m. to 2 p.m. on Saturday, October 19 at 9800 Lawler, Skokie. Tour the state-of-the-art facilities, watch the Niles North swimmers/divers in action, and learn about community swim lessons and other opportunities
Tuesday, October 15, 2013
Tuesday, September 10, 2013
Almost Open...
The Niles North Aquatics Center
is slated to become
the first LEED for Schools Gold
certified aquatics facility in Illinois. The design reduces energy use by 44%
compared to a standard code-compliant building of similar size, resulting in
annual energy savings of 31.5%. The Grand Opening of the Facility is slated for October, but you can see images of the completed facility HERE.
![]() |
| View looking NE at the SW corner of the Aquatics Center |
Monday, July 29, 2013
Bubbler Arrives
The new bubbler system (also called sparging system),
designed by Pulsair Systems has recently been installed below the 3m and one of the 1m diving
boards in the new Aquatics Center.
But what exactly is a bubbler system? It’s a way to reduce the surface tension of the water to provide a softer landing for
the diver’s during training. The system injects compressed air from a tank (below) into
long diffusers (left) at the bottom of the pool. Air bubbles rise and aerate the water surface to create a soft
cushion of air and water for the diver.
The system allows divers to try new and more complex dives without
a fear of landing incorrectly. Coaches can use a remote control to adjust the
system as they move around the pool.Thanks to Pulsair Systems for the photos
Monday, July 22, 2013
In the Home Stretch
Well, we are less than a month away and there is a lot going on at the Niles North Aquatics Center. The exterior metal panel installation is close to completion and site work is well underway to provide a new sidewalk and access road along the south end of the addition.
| View of the Southeast corner of the Aquatics Center |
| View of the Southwest corner of the Aquatics Center |
There is even more activity taking place on the interior as finish materials (textured wall panels, ceramic tile, glass guardrails, etc) continue to be installed and the existing pool has even begun to be filled. The new pool should be filled by the end of the month and then the focus will turn to the testing and balancing of the mechanical units and pool filtration equipment.
| View of Entry Corridor Concessions and Display Case |
| View looking East at New Pool - Glass Guardrail, Bleachers and Starting Blocks are now in place |
| View of 1m and 3m Diving Platforms |
| View of Existing Pool - Pool should be completely filled today or tomorrow |
Monday, June 24, 2013
Happy Summer!
While most people are excited to get outside and hit the pools for summer, we are excited because our pools are finally enclosed. The installation of the metal panel at the overhangs continues, but the rest of the exterior construction has been completed on the new Aquatics Center. This now allows the contractors to finish off the interior finishes, with a main focus on the tile installation. Less than 2 months left to go...
| View of Southwest corner of Aquatics Center |
| View of the South Elevation of the Aquatics Center |
| View looking East at the Existing Pool Tile installation |
| View looking West inside the new Competition Pool |
| View looking East inside the new Competition Pool |
Sunday, May 26, 2013
The Bulkhead Has Arrived
![]() |
| Image of the Bulkhead which is just over 60' long and was delivered in a single piece! |
| View inside looking East - The Bulkhead is iinstalled and is currently resting along the east end of the pool |
| View inside looking East in Existing Pool - Deck Tile and Painting are almost complete |
| View inside looking West - 1m and 3m Diving Platforms have been completed and the interior masonry is almost complete |
| View looking East - Translucent glass installation is almost complete, which will provide natural ligth without the glare |
Sunday, April 14, 2013
Interior starting to take shape
| View inside Entry Corridor - Concessions and Display Case |
| View looking West from Public Corridor |
| View looking South from Existing Pool to New Pool |
| View looking at New Pool Slab from Balcony |